Requirements
1.
Application for evaluation of detailed plans (2 original )
2.
Investor's approval of construction plans (2 simple copies)
Stamped with company's seal
3.
Finalized conceptual plans (2 original )
Signed and stamped by legal representative of the company
4.
Certificate of fire prevention and fighting (2 simple copies)
Stamped with company's seal
5.
Endorsed environment impact assessment report (2 simple copies)
Stamped with company's seal
6.
Overall report by the investor
(2 original ) on:
- 1) performance capacity of geo-technical contractor,
- 2) work experience of designer & survey team leader, and other designers
- 3) evaluation of the dossier components and quality whether they are compliant with the requirements of legal regulations, whether they meet the investor's needs.
7.
Geo-technical survey report related to construction drawings and notes on the designing (2 simple copies)
Stamped with company's seal
8.
Endorsed detailed construction plans
(2 original ) The detailed construction plans must consist of the following plans:
- a) Current land surface drawing and position of construction works direction as per the approved 1/500 scale detailed construction planning;
- b) Total area, including defined construction position, construction area, construction boundary lines, construction height, etc,.
- c) Construction designing, including horizontal planes, vertical planes and cross-sectional planes of all the construction components and the whole construction works; drawings of technology designing, construction implementation measures related to the construction designing.
- d) Methods of consolidation, treatment of ground floor surface or foundation, key load-bearing structures, technical systems of the works, infrastructure facilities.e) Designs of key joints, essential joints of key load-bearing structures & compulsory compositions (safety composition, vibration resistant & erosion-resistant structures).
- f) Fire & explosion prevention, and emergency exit plans approved by relevant fire prevention and fighting authority(enclosed below).
9.
Endorsed 1/50 - 1/200 scaled fire protection and fighting plans (original + Simple copy)
10.
Notes to the detailed plans (2 original )
11.
Construction designing competency report (original + Simple copy)
12.
Soft copies of detailed plans and notes on a USD stick or CD rom (original)
Time frame
The date to come back is noted down in the receipt of application.
Waiting time in queue:
Min. 5mn - Max. 10mn
Attention at counter:
Min. 20mn - Max. 30mn
Waiting time until next step:
Min. 20 days - Max. 30 days
Legal justification
1.
Law on construction No. 50/2014/QH13 dated 18/06/2014 passed by the 13th National Assembly
Article 57
2.
Decree 59/2015/ND-CP dated 18/06/2015 by the Government, regarding construction project management
articles 26.1.b, 29, 30.4
3.
Decision 11/2015/QD-UBND dated 30/06/2015 by Binh Dinh Provincial People's Committee, promulgating protocols on authorization, decentralization, signing responsibilities for evaluation, approval of construction projects and designs, cost estimates of construction projects in the province
articles 6.3.a, 6.3.c
Who certified this information ?
Bao VIET TRAN, Deputy Director,
15/04/2015