List of steps
(Total number of steps: 84)
Meet with Binh Dinh Department of Investment and Planning (DPI)
Obtain outlined cadastral map of land site  (2)
Obtain certified copies of documents  (2)
Obtain consular-legalized copies of foreign documents  (3)
Obtain certified translation of documents  (2)
Obtain authenticated copies of passports or Vietnamese ID cards  (2)
Obtain approval of investment intent  (2)
Obtain authenticated copies of investment intent approval  (2)
Obtain investment certificate  (2)
Obtain authenticated copies of investment certificate  (2)
Obtain enterprise registration Certificate (ERC)  (2)
Announce enterprise registration content and notify use of seal sample  (2)
Obtain certificate of tax registration  (2)
Open bank account  (1)
Obtain sectional cadastral map of the land plot  (3)
Obtain approval of land lease intention  (2)
Obtain district people's committee's decisions on land recovery  (9)
Obtain planning license  (4)
Obtain approval of 1/500 scale construction designing plan  (4)
Obtain authenticated copies of approval of 1/500 scale construction designing plan  (2)
Obtain approval of land lease  (3)
Obtain approval of land site boundary  (2)
Obtain land lease contract and land use right certificate  (4)
Obtain authenticated copies of land use rights certificate  (2)
Obtain approval of environment impact assessment report  (5)
Obtain evaluation of conceptual plans  (8)
Obtain approval of fire prevention and fighting plan  (2)
Obtain evaluation of detailed construction plans  (4)
Obtain construction permit  (4)

Preview & Print

Properties
 
74
Finalize conceptual plans and prepare detailed plans or technical designs
(last modified: 10/4/2015)

Expected results

Finalized conceptual plans x3 Finalized conceptual plans
Investor's approval of construction plans Investor's approval of construction plans
1/50 - 1/200 scale fire protection and fighting plans x3 1/50 - 1/200 scale fire protection and fighting plans
Construction project cost estimate x3 Construction project cost estimate
Technical designs (printed on A1 or A2 sized paper) x3 Technical designs (printed on A1 or A2 sized paper)
Detailed construction plans (printed on A1 or A2 sized paper) x3 Detailed construction plans (printed on A1 or A2 sized paper)
Overall report by the investor Overall report by the investor
Notes to the detailed plans x3 Notes to the detailed plans
Soft copies of detailed plans and notes on a USD stick or CD rom 01 - Soft copies of detailed plans and notes on a USD stick or CD rom
Drawings of key weight-bearing structures and composition Drawings of key weight-bearing structures and composition

Requirements

1. Conceptual plan appraisal results
Conceptual plan appraisal results (Simple copy)

Costs

Payment methods: cash, bank transfer
Costs are only applied if the tasks are outsourced.

Time frame

Time frame is only applied if the tasked are outsourced.

Legal justification

1. Law on construction No. 50/2014/QH13 dated 18/06/2014 passed by the 13th National Assembly
Law on construction No. 50/2014/QH13 dated 18/06/2014 passed by the 13th National Assembly
articles 78.5, 83.1
2. Decree 59/2015/ND-CP dated 18/06/2015 by the Government, regarding construction  project management
Decree 59/2015/ND-CP dated 18/06/2015 by the Government, regarding construction project management
Article 23.3

Additional information

Investor(s) needs to produce a report on his/her evaluation and approval of either the technical designs or detailed construction plans according to his/her discrete of which he/she needs for the construction implementation stage.
Investor has to produce an approval of construction implementation plans to ensure safety for neighboring constructions and/or buildings if a basement is to be constructed in his/her construction project.
The detailed construction plans must consist of the following plans:
  • a) Current land surface drawing and position of construction works direction as per the approved 1/500 scale detailed construction planning;
  • b) Total area, including defined construction position, construction area, construction boundary lines, construction height, etc,.
  • c) Construction designing, including horizontal planes, vertical planes and cross-sectional planes of all the construction components and the whole construction works; drawings of technology designing, construction implementation measures related to the construction designing.
  • d) Methods of consolidation, treatment of ground floor surface or foundation, key load-bearing structures, technical systems of the works, infrastructure facilities.e) Designs of key joints, essential joints of key load-bearing structures & compulsory compositions (safety composition, vibration resistant & erosion-resistant structures).
  • f) Fire & explosion prevention, and emergency exit plans approved by relevant fire prevention and fighting authority.