List of steps
(Total number of steps: 84)
Meet with Binh Dinh Department of Investment and Planning (DPI)
Obtain outlined cadastral map of land site  (2)
Obtain certified copies of documents  (2)
Obtain consular-legalized copies of foreign documents  (3)
Obtain certified translation of documents  (2)
Obtain authenticated copies of passports or Vietnamese ID cards  (2)
Obtain approval of investment intent  (2)
Obtain authenticated copies of investment intent approval  (2)
Obtain investment certificate  (2)
Obtain authenticated copies of investment certificate  (2)
Obtain enterprise registration Certificate (ERC)  (2)
Announce enterprise registration content and notify use of seal sample  (2)
Obtain certificate of tax registration  (2)
Open bank account  (1)
Obtain sectional cadastral map of the land plot  (3)
Obtain approval of land lease intention  (2)
Obtain district people's committee's decisions on land recovery  (9)
Obtain planning license  (4)
Obtain approval of 1/500 scale construction designing plan  (4)
Obtain authenticated copies of approval of 1/500 scale construction designing plan  (2)
Obtain approval of land lease  (3)
Obtain approval of land site boundary  (2)
Obtain land lease contract and land use right certificate  (4)
Obtain authenticated copies of land use rights certificate  (2)
Obtain approval of environment impact assessment report  (5)
Obtain evaluation of conceptual plans  (8)
Obtain approval of fire prevention and fighting plan  (2)
Obtain evaluation of detailed construction plans  (4)
Obtain construction permit  (4)

Preview & Print

Properties
 
45
Conduct topographical survey and prepare overall construction plan
(last modified: 10/4/2015)

Expected results

Topographical survey method description x3 Topographical survey method description
Topographical survey diary x3 Topographical survey diary
Topographical map production report x3 Topographical map production report
1/500-scaled topographical survey report x3 1/500-scaled topographical survey report
1/500-scaled construction plan assignment description x3 1/500-scaled construction plan assignment description
1/500 scale overall construction plan x3 01 - 1/500 scale overall construction plan
1/500-scaled construction plan specifications x3 1/500-scaled construction plan specifications
Specification files and autocad, photos, scanned files of all the documents on a CD rom 01 - Specification files and autocad, photos, scanned files of all the documents on a CD rom
MInutes of meeting with local community x3 MInutes of meeting with local community
Designing capacity statement x3 Designing capacity statement

Requirements

Costs

Payment methods: cash, bank transfer
Investors can conduct the topographical survey and produce 1/500-scale construction plan themselves if they employ sufficient qualified architects, engineers and workers. Otherwise, they have to outsource the survey and the plan. And it will incur costs.

Time frame

Waiting time in queue: Min. 5mn - Max. 10mn
Attention at counter: Min. 20mn - Max. 30mn

Legal justification

1. Law on urban planning No.30/2009/QH12 dated 17/6/2009 by the National Assembly No.12
Law on urban planning No.30/2009/QH12 dated 17/6/2009 by the National Assembly No.12
Article 10
2. Circular 05/2011/TT-BXD dated 09/06/2011 by the Ministry of Construction providing regulations on checking, evaluation and acceptance of topographical map for construction planning and designing
Circular 05/2011/TT-BXD dated 09/06/2011 by the Ministry of Construction providing regulations on checking, evaluation and acceptance of topographical map for construction planning and designing
articles 3.1.a, 4.1.
3. Decision 21/2005/QD-BXD dated 22/07/2005 by the Minister of Construction stipulating guidelines on signs and symbols used in drawings of construction master plans
Decision 21/2005/QD-BXD dated 22/07/2005 by the Minister of Construction stipulating guidelines on signs and symbols used in drawings of construction master plans
Article 1

Additional information

Investor(s) can conduct topographical survey and 1/500-scaled construction plan themselves if they employ sufficient qualified technical staff as specified in Article 10 of Law on Urban Planning No. 30/2009/QH11 or they can go to a construction designing consultant for the survey and the plan.