List of steps
(Total number of steps: 50)
Meet with Binh Dinh Economic Zone Administration (BEZA)
Obtain principle agreement for land reservation  (1)
Obtain certified copies of documents  (2)
Obtain consular-legalized copies of foreign documents  (3)
Obtain certified translation of documents  (2)
Obtain authenticated copies of passports or Vietnamese ID cards  (2)
Obtain investment registration Certificate  (2)
Obtain authenticated copies of the investment registration Certificate  (2)
Obtain enterprise registration Certificate  (2)
Announce enterprise registration and seal specimen on National Business Registration Portal  (2)
Obtain certificate of tax registration  (2)
Open bank account  (1)
Obtain approval of 1/500-scaled detailed plannning  (5)
Obtain land lease contract and certificate of land use rights  (5)
Obtain authenticated copies of land use rights certificate  (2)
Obtain environment impact assessment (EIA) report approval  (6)
Obtain conceptual plans appraisal  (5)
Obtain approval of fire protection and fighting plan  (2)
Obtain construction permit  (4)

Preview & Print

Properties
 
22
Prepare 1/500-scaled detailed planning
(last modified: 9/20/2015)

Expected results

1/500-scaled detailed plan drawings x3 01 - 1/500-scaled detailed plan drawings
Specifications of 1/500-scaled detailed planning x3 Specifications of 1/500-scaled detailed planning
Topographical survey report x3 Topographical survey report
Minutes of 1/500-scaled planning meeting Minutes of 1/500-scaled planning meeting
Construction planning competency report Construction planning competency report
Soft copy of 1/500-scaled detailed planning on CD rom 01 - Soft copy of 1/500-scaled detailed planning on CD rom
Draft management protocols of detailed planning for project inside urban areas in economic zones Draft management protocols of detailed planning for project inside urban areas in economic zones

Requirements

1. Investment project proposal/Feasibility study report
Investment project proposal/Feasibility study report (Simple copy)
2. 01 - Libre deuda de patente
Master plan of Nhon Hoi Economic Zone (Simple copy)
3. Land use rights certificate
Land use rights certificate (Simple copy)

Costs

Costs are applied only if investor outsources the production of the 1/500-scaled detailed planning.

Legal justification

1. Law on urban planning No.30/2009/QH12 dated 17/6/2009 by the National Assembly No.12
Law on urban planning No.30/2009/QH12 dated 17/6/2009 by the National Assembly No.12
Article 10
2. Decision 21/2005/QD-BXD dated 22/07/2005 by the Minister of Construction stipulating guidelines on signs and symbols used in drawings of construction master plans
Decision 21/2005/QD-BXD dated 22/07/2005 by the Minister of Construction stipulating guidelines on signs and symbols used in drawings of construction master plans
Article 1
3. Circular 05/2011/TT-BXD dated 09/06/2011 by the Ministry of Construction providing regulations on checking, evaluation and acceptance of topographical map for construction planning and designing
Circular 05/2011/TT-BXD dated 09/06/2011 by the Ministry of Construction providing regulations on checking, evaluation and acceptance of topographical map for construction planning and designing
articles 3.1.a, 4.1

Additional information

Investor(s) can conduct topographical survey and 1/500-scaled construction plan themselves if they employ sufficient qualified technical staff as specified in Article 10 of Law on Urban Planning No. 30/2009/QH11 or they can go to a construction designing consultant for the survey and the plan.